Air Funding Program Recipients
DEQ has been operating the Clean Diesel (DERA) program since FY 2008 and Volkswagen Settlement programs since 2018. Below you will find recipient details for all Volkswagen Settlement programs and Clean Diesel programs.
Check out our new interactive map dashboards! VW and DERA 2017-Present DERA 2008-2012
Volkswagen Settlement Recipients
FY 2022 Alternative Fuel School Bus (AFSB) Program FY 2020 AFSB FY 2019 AFSB FY 2018 AFSBChargeOK FY2021ChargeOK 2019 FY 2021 On-Road Program Non-Road Program
FY22 projects are in progress. Award amounts and descriptions may change upon completion. AFSB Program page
Entity
|
Award Amount
|
Project Description
|
Bethany Public Schools (PS) |
$275,019.75 |
Replacement of three diesel school buses (vehicle years 2005, 2007, 2007) with three EPA-certified 2022 or newer Propane/LPG school buses |
Cave Springs PS |
$101,116.50 |
Replacement of one diesel school bus (vehicle year 2009) with one EPA-certified 2022 or newer Propane/LPG school buses |
Woodall PS |
$91,466 |
Replacement of one diesel school bus (vehicle year 2000) with one EPA-certified 2022 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Cameron Public Schools (PS) |
$139,344 |
Replacement of three diesel school buses (vehicle years 2000, 2001, 2009) with three EPA-certified 2020 or newer Propane/LPG school buses |
Keystone PS |
$138,472.50 |
Replacement of three diesel school buses (vehicle years 1991, 2004, 2004) with three EPA-certified 2020 or newer Propane/LPG school buses |
Nashoba PS |
$92,988 |
Replacement of two diesel school buses (vehicle years 2006, 2003) with two EPA-certified 2020 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Anadarko Public Schools (PS) |
$304,557.50 |
Replacement of two diesel school buses (vehicle years 1996, 1999) with two EPA-certified 2019 or newer Propane/LPG school buses |
Battiest PS |
$225,877 |
Replacement of five diesel school buses (vehicle years 2001, 2004, 2004, 2005, and 2008) with five EPA-certified 2019 or newer Propane/LPG school buses |
Bethany PS |
$93,790.90 |
Replacement of two diesel school buses (vehicle years 2000 and 2004) with two EPA-certified 2019 or newer Propane/LPG school buses |
Chattanooga PS |
$181,288 |
Replacement of four diesel school buses (vehicle years 2003, 2003, 2007, and 2007) with four EPA-certified 2019 or newer Propane/LPG school buses |
Cordell PS |
$125,257.23 |
Replacement of three diesel school buses (vehicle years 2000, 2004, and 2004) with three EPA-certified 2019 or newer Propane/LPG school buses |
Davenport PS |
$43,773.24 |
Replacement of one 1999 diesel school bus with one EPA-certified 2019 or newer Propane/LPG school bus |
Empire PS |
$125,257.23 |
Replacement of three diesel school buses (vehicle years 1998, 1999, and 2000) with three EPA-certified 2019 or newer Propane/LPG school buses |
Gans PS |
$125,624 |
Replacement of three diesel school buses (vehicle years 2007, 2008, and 2008) with three EPA-certified 2019 or newer Propane/LPG school buses |
Keys PS |
$91,834 |
Replacement of two 2002 diesel school buses with two EPA-certified 2019 or newer Propane/LPG school buses |
Ponca City PS |
$115,505 |
Replacement of three diesel school buses (vehicle years 2003, 2007, and 2007) with three EPA-certified 2019 or newer Propane/LPG school buses |
Wellston PS |
$83,628 |
Replacement of two diesel school buses (vehicle years 1999 and 2004) with two EPA-certified 2019 or newer Propane/LPG school buses |
Entity
|
Award Amount
|
Project Description
|
Anadarko Public Schools (PS) |
$226,955 |
Replacement of two 1999 diesel school buses, one 2007 diesel school bus, one 2008 diesel school bus, and one 2009 diesel school bus with five EPA-certified 2017 or newer Propane/LPG school buses |
Bethany PS |
$89,983.62 |
Replacement of one 1994 diesel school bus and one 1998 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
Keys PS |
$90,836 |
Replacement of one 2004 diesel school bus and one 2007 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
Mangum PS |
$88,966 |
Replacement of one 1996 diesel school bus and one 2006 diesel school bus with two EPA-certified 2017 or newer Propane/LPG school buses |
McCord PS |
$36,655 |
Replacement of one 2006 diesel school bus with one EPA-certified 2017 or newer Propane/LPG school bus |
Perkins-Tryon PS |
$128,092 |
Replacement of two 2004 diesel school buses and one 2005 diesel school bus with three EPA-certified 2017 or newer Propane/LPG school buses |
Ponca City PS |
$41,978 |
Replacement of one 2003 diesel school bus and two 2007 diesel school buses with three EPA-certified 2017 or newer Propane/LPG school buses |
Stroud PS |
$45,418 |
Replacement of one 2005 diesel school bus with one EPA-certified 2017 or newer Propane/LPG school bus |
Weatherford PS |
$215,760 |
Replacement of three 2005 diesel school buses and one 2008 diesel school bus with four EPA-certified 2017 or newer CNG school buses |
Wellston PS |
$161,544 |
Replacement of three 1999 diesel school buses and one 1995 diesel school bus with four EPA-certified 2017 or newer Propane/LPG school buses |
The ChargeOK program has issued notifications to proceed for all projects awarded in FY2021. Specific charging station locations will be available once the recipients submit information to the US Department of Energy’s Alternative Fuel Data Center (click for interactive map). Users may also find the nearest charging station at plugshare.com.
Entity
|
Award Amount
|
Project Location
|
Number of Chargers
|
Level 2
|
Level 3
|
City of Comanche |
|
|
|
|
|
$70,512 |
Comanche |
|
2 |
City of Perry |
|
|
|
|
|
$53,407.20 |
Perry |
|
1 |
Francis Energy |
|
|
|
|
|
$253,693.60 |
Hobart |
|
2 |
ASAP Energy |
|
|
|
|
|
$98,544.80 |
Duncan |
|
2 |
|
$121,556.80 |
Weatherford |
|
2 |
Excel Food Mart |
|
|
|
|
|
$166,112.11 |
Okemah |
|
2 |
The ChargeOK program has issued notifications to proceed for all projects awarded in 2019. Specific charging station locations will be available once the recipients submit information to the US Department of Energy’s Alternative Fuel Data Center (click for interactive map). Users may also find the nearest charging station at plugshare.com.
Entity
|
Award Amount
|
Project Location
|
Number of Chargers
|
Level 2
|
Level 3
|
City of Pawhuska |
|
|
|
|
|
$17,115.20 |
Pawhuska |
1 |
|
Catoosa Hospitality Management Inc. |
|
|
|
|
|
$8,080 |
Catoosa |
1 |
|
Owasso Hospitality Management Inc. |
|
|
|
|
|
$8,080 |
Owasso |
1 |
|
City of Edmond |
|
|
|
|
|
$25,367 |
Edmond |
10 |
|
Oklahoma City Community College |
|
|
|
|
|
$127,753 |
Oklahoma City Community College |
8 |
|
OnCue |
|
|
|
|
|
$101,495.19 |
Edmond |
|
1 |
|
$96,770.34 |
Midwest City |
|
1 |
|
$94,555.74 |
Oklahoma City S. Meridian |
|
1 |
|
$96,639 |
Oklahoma City NW 36th |
|
1 |
Francis Solar |
|
|
|
|
|
$56,848 |
Antlers |
|
2 |
|
$105,937 |
Blackwell |
|
4 |
|
$114,961 |
Chandler – Turner Turnpike |
|
4 |
|
$66,580 |
Chickasha – H. E. Bailey Turnpike |
|
2 |
|
$46,708.10 |
Durant |
|
4 |
|
$61,286 |
Enid |
|
2 |
|
$43,129 |
Guymon |
|
2 |
|
$49,862.57 |
Henryetta |
|
2 |
|
$109,283 |
Lawton |
|
4 |
|
$115,091 |
McAlester – Indian Nations Turnpike |
|
4 |
|
$108,342 |
Muskogee |
|
4 |
|
$66,580 |
Muskogee – Muskogee Turnpike |
|
2 |
|
$44,014 |
Norman |
|
2 |
|
$66,431 |
Seiling |
|
2 |
|
$54,278 |
Stillwater |
|
2 |
|
$108,312 |
Tulsa S. Memorial |
|
4 |
|
$39,523 |
Tulsa S. Darlington |
|
2 |
|
$100,698 |
Wagoner |
|
4 |
FY21 projects are in progress. Award amounts and descriptions may change upon completion. On-Road Program page
Entity
|
Award Amount
|
Project Description
|
A & A Trucking, Inc |
$258,453.68 |
4 Heavy Duty CNG Dump Trucks |
Canadian County District 1 |
$110,744.58 |
1 Heavy Duty Diesel Dump Truck |
Central Oklahoma Transportation and Parking Authority |
$666,661.00 |
1 Heavy Duty CNG Transit Bus and 2 Medium Duty CNG Shuttle Buses |
City of Elk City |
$213,039.75 |
1 Heavy Duty CNG Trash Truck |
City of Lawton |
$638,532.00 |
3 Heavy Duty Diesel Dump Trucks and 2 Heavy Duty Diesel Waste Haulers |
City of Moore |
$162,153.00 |
1 Medium Duty CNG Grapple Truck |
City of Midwest City |
$200,000.00 |
1 Heavy Duty CNG Refuse Truck |
City of Norman |
$450,000.00 |
1 Heavy Duty Electric Transit Bus |
Oklahoma City Environmental Assistance Trust |
$302,000.00 |
2 Heavy Duty CNG Refuse Trucks |
City of Stroud |
$66,198.00 |
1 Medium Duty Diesel Dump Truck |
Sysco Oklahoma, LLC |
$66,198.00 |
14 Heavy Duty Diesel Freight Trucks |
City of Tulsa |
$189,504.42 |
14 Heavy Duty Diesel Freight Trucks |
Non-Road projects are in progress. Award amounts and descriptions may change upon completion. Non-Road Program page
Entity
|
Award Amount
|
Project Description
|
GasTech Engineering, LLC |
$123,600.60 |
1 Electric Lift Truck |
Hiland Dairy Foods Company, LLC |
$378,584.00 |
2 Electric Terminal Tractors |
Roll Offs of America, Inc |
$ 76,350.00 |
1 Electric Lift Truck |
Clean Diesel (DERA) Recipients
FY 2023FY 2022FY 2021FY 2020FY 2019FY 2018FY 2017FY 2012FY 2011FY 2010FY 2009FY 2008ARRA/Stimulus Program
FY23 subgrantees have been awarded. Subaward amounts and descriptions may change upon completion. DERA Program Page
Subgrantee
|
Subaward Amount
|
Project Description
|
Collinsville Public Schools |
$68,017.50 |
Replacement of two 2001 diesel school buses with two EPA-certified 2021 or newer diesel school buses. |
Elgin Public Schools |
$64,250.00 |
Replacement of two 2004 diesel school buses with two EPA-certified 2021 or newer diesel school buses. |
Lexington Public Schools |
$32,704.00 |
Replacement of one 2007 diesel school bus with one EPA-certified 2021 or newer diesel school bus. |
Quinton Public Schools |
$22,000.00 |
Replacement of one 2008 diesel school bus with one EPA-certified 2021 or newer diesel school bus. |
Sequoyah Public Schools |
$58,500.00 |
Replacement of one 2006, one 2007, and one 2008 with three EPA-certified 2021 or newer diesel school buses. |
Yarbrough Public Schools |
$61,708.00 |
Replacement of one 1999 and one 2004 diesel school buses with two EPA-certified 2021 or newer gasoline school buses. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Bishop Public Schools |
$35,145.75 |
Replacement of one 2010 diesel school bus with one EPA-certified 2024 gasoline school bus. |
Broken Arrow Public Schools |
$51,533.25 |
Replacement of one 2001, one 2002, and one 2003 diesel school bus with three EPA-certified 2021 diesel buses. |
Catoosa Public Schools |
$29,980.00 |
Replacement of one 2007 diesel school bus with one EPA-certified 2024 diesel school bus. |
Choctaw Nicoma Park Public Schools |
$55,000.00 |
Replacement of one 1999 and one 2000 diesel school buses with two 2023 EPA-certified diesel school buses. |
Cleveland Public Schools |
$28,352.00 |
Replacement of one 2009 diesel school bus with one EPA-certified 2024 gasoline school bus. |
Elk City Public Schools |
$23,000.00 |
Replacement of one 2004 diesel school bus with one 2024 EPA-certified diesel school bus. |
Guthrie Public Schools |
$45,576.00 |
Replacement of two 2009 diesel school buses with two EPA-certified 2020 diesel school buses. |
Lexington Public Schools |
$28,811.00 |
Replacement of one 2000 diesel school bus with one EPA-certified 2024 diesel school bus. |
Rock Creek Public Schools |
$17,350.00 |
Replacement of one 2006 diesel school bus with one EPA-certified 2021 diesel school bus. |
Sand Springs Public Schools |
$71,511.00 |
Replacement of one 2004, and one 2006 diesel school bus with two EPA-certified 2025 diesel buses. |
Yukon Public Schools |
$154,121.00 |
Replacement of one 2001, two 2002s, and two 2005s diesel school buses with five EPA-certified 2024 gasoline school buses. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Bennington Public Schools |
$21,250.00 |
Replacement of one 2009 diesel school bus with one 2023 EPA-certified diesel school bus. |
Blanchard Public Schools |
$51,760.50 |
Replacement of one 2005 and one 2009 diesel school buses with two 2023 EPA-certified diesel school buses. |
Central High Public Schools |
$49,429.75 |
Replacement of two 2010 diesel school buses with two 2022 EPA-certified gasoline school buses. |
Colbert Public Schools |
$16,250.00 |
Replacement of one 2006 diesel school bus with one 2019 EPA-certified diesel school bus. |
Commerce Public Schools |
$101,997.00 |
Replacement of one 2005 and three 2010 diesel school buses with four 2022 EPA-certified gasoline school buses. |
Fairland Public Schools |
$26,756.00 |
Replacement of one 2007 diesel school bus with one 2023 EPA-certified gasoline school bus. |
Heavener Public Schools |
$57,696.50 |
Replacement of two 2005 diesel school buses with two 2024 EPA-certified gasoline school buses. |
Howe Public Schools |
$77,811.00 |
Replacement of three 2008 diesel school buses with three 2023 EPA-certified diesel school buses |
Lexington Public Schools |
$73,275.00 |
Replacement of two 1997 and one 1998 diesel school buses with three 2022 EPA-certified diesel school buses. |
Mustang Public Schools |
$104,955.00 |
Replacement of three 2009 diesel school buses with three 2024 EPA-certified gasoline school buses. |
Pawnee Public Schools |
$20,000.00 |
Replacement of one 2009 diesel school bus with one 2023 EPA-certified gasoline school bus. |
Stigler Public Schools |
$21,662.00 |
Replacement of one 2009 diesel school bus with one 2021 EPA-certified diesel school bus. |
Stillwater Public Schools |
$66,881.25 |
Replacement of two 2007, and one 2009 diesel school buses with three 2022 EPA-certified diesel school buses. |
Temple Public Schools |
$25,708.00 |
Replacement of one 2009 diesel school bus with one 2021 EPA-certified gasoline school bus. |
Yukon Public Schools |
$21,250.00 |
Replacement of one 2004 diesel school bus with one 2022 EPA-certified gasoline school bus. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Allen Public Schools |
$26,742.25 |
Replacement of one 2007 diesel school bus with one 2022 EPA-certified diesel school bus. |
Cave Springs Public Schools |
$19,882.25 |
Replacement of one 2004 diesel school bus with one 2023 EPA-certified diesel school bus. |
Central High Public Schools |
$18,954.00 |
Replacement of one 2007 diesel school bus with one 2021 EPA-certified gasoline school bus. |
Claremore Public Schools |
$21,955.25 |
Replacement of one 1999 diesel school bus with one 2022 EPA-certified diesel school bus. |
Enid Public Schools |
$38,375.00 |
Replacement of one 1999 diesel school bus with one 2022 EPA-certified diesel school bus. |
Fairland Public Schools |
$18,808.00 |
Replacement of one 20075 diesel school bus with one 2021 EPA-certified gasoline school bus. |
Kingfisher Public Schools |
$40,000.00 |
Replacement of one 2003 and one 2005 diesel school buses with two 2021 EPA-certified diesel school buses. |
Mannford Public Schools |
$20,482.00 |
Replacement of one 1996 diesel school bus with one 2022 EPA-certified diesel school bus. |
Miami Public Schools |
$41,104.00 |
Replacement of one 1998 and one 2002 diesel school bus with two 2017 EPA-certified diesel school buses. |
Mustang Public Schools |
$71,124.75 |
Replacement of two 2003 and one 2005 diesel school buses with three 2021 EPA-certified gasoline school buses. |
Shady Grove Public Schools |
$19,700.00 |
Replacement of one 2005 diesel school bus with one 2021 EPA-certified diesel school bus. |
Talihina Public Schools |
$19,675.00 |
Replacement of one 1999 diesel school bus with one 2021 EPA-certified diesel school bus |
Taloga Public Schools |
$21,100.00 |
Replacement of one 1999 diesel school bus with one 2022 EPA-certified diesel school bus. |
Yukon Public Schools |
$84,766.44 |
Replacement of one 2000, one 2002, and two 2005 diesel school buses with four 2020 EPA-certified gasoline school buses. |
Zaneis Public Schools |
$20,495.00 |
Replacement of one 2005 diesel school bus with one 2022 EPA-certified diesel school bus. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Bishop Public Schools |
$20,920.50 |
Replacement of one 2001 diesel school bus with one 2021 EPA-certified gasoline school bus. |
Boswell Public Schools |
$43,823 |
Replacement of one 1997 and one 2009 diesel school buses with two 2021 EPA-certified diesel school buses. |
Davenport Public Schools |
$39,924.75 |
Replacement of one 1998 diesel school bus with one 2021 EPA-certified diesel school bus. |
Edmond Public Schools |
$239,607.50 |
Replacement of two 2002, one 2003, five 2008, and two 2009 diesel school buses with ten 2021 EPA-certified gasoline school buses. |
Enid Public Schools |
$37,253.75 |
Replacement of one 1995 diesel school bus with one 2020 EPA-certified diesel school bus |
Fort Towson Public Schools |
$59,750 |
Replacement of one 2004, one 2005, and one 2009 diesel school buses with three 2021 EPA-certified diesel school buses |
Lexington Public Schools |
$18,890 |
Replacement of one 1998 diesel school bus with one 2021 EPA-certified diesel school bus |
Middleberg Public Schools |
$43,804 |
Replacement of two 2005 diesel school buses with two 2017 EPA-certified diesel school buses. |
Mounds Public Schools |
$19,989 |
Replacement of one 2008 diesel school bus with one 2020 EPA-certified diesel school bus. |
Mustang Public Schools |
$62,907.75 |
Replacement of one 1999, one 2001, and one 2002 diesel school buses with three 2020 EPA-certified gasoline school buses. |
Noble Public Schools |
$42,500 |
Replacement of one 2008 and one 2009 diesel school buses with two 2021 EPA-certified diesel school buses. |
Silo Public Schools |
$24,985.91 |
Replacement of one 1999 diesel school bus with one 2021 EPA-certified diesel school bus. |
Washington Public Schools |
$39,963.50 |
Replacement of two 2002 diesel school buses with two 2020 EPA-certified diesel school buses. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Calera Public Schools |
$35,440.50 |
Replacement of one 1999 diesel school bus and one 2002 diesel school bus with two 2020 EPA-certified gasoline school buses. |
Caney Valley Public Schools |
$19,725 |
Replacement of one 2005 diesel school bus with one 2019 EPA-certified diesel school bus. |
Edmond Public Schools |
$234,827 |
Replacement of four 2001, two 2002, and four 2003 diesel school buses with ten 2019 EPA-certified gasoline school buses. |
Lawton Public Schools |
$97,500 |
Replacement of two 1998, two 1999, and one 2000 diesel school bus with five 2019 EPA-certified diesel school buses. |
Piedmont Public Schools |
$22,866.75 |
Replacement of one 2005 diesel school bus with one 2020 EPA-certified diesel school bus. |
Spiro Public Schools |
$65,869 |
Replacement of one 1996, one 2000, and one 2001 diesel school bus with three 2019 EPA-certified school buses. |
Stigler Public Schools |
$18,567 |
Replacement of one 2006 diesel school bus with a 2020 EPA-certified diesel school bus |
Vian Public Schools |
$19,185 |
Replacement of one 2005 diesel school bus with a 2019 EPA-certified diesel school bus. |
Yukon Public Schools |
$177,931.25 |
Replacement of one 2002, two 2003, two 2004 , and four 2005 diesel school buses with nine 2018 EPA-certified gasoline school buses. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Boswell Public Schools |
$18,208.75 |
Replacement of one 1995 diesel school bus with a 2018 EPA-certified diesel school bus. |
Broken Arrow Public Schools |
$88,000 |
Replacement of five 1996 diesel school buses with five new 2018 EPA-certified diesel school buses. |
Carnegie Public Schools |
$40,961 |
Replacement of one 2004 and one 2006 diesel activity school bus with two new 2019 EPA-certified diesel school buses. |
Catoosa Public Schools |
$20,497.25 |
Replacement of one 1999 diesel school bus with one 2018 EPA-certified diesel school bus. |
Comanche Public Schools |
$26,517.75 |
Replacement of one 1996 diesel school bus with one 2019 EPA-certified diesel school bus. |
Dolese Bros |
$47,195 |
Replacement of one 2002 heavy-duty diesel truck with one new 2018 EPA-certified heavy-duty truck. |
Howe Public Schools |
$63,019.50 |
Replacement of one 2003 and two 2004 diesel school buses with three new 2019 EPA-certified diesel school buses. |
Noble Public Schools |
$21,000 |
Replacement of one 2002 diesel school bus with one 2018 EPA-certified diesel school bus. |
Oaks Public Schools |
$19,380.50 |
Replacement of one 2002 diesel school bus with one 2018 EPA-certified diesel school bus. |
Piedmont Public Schools |
$21,448.00 |
Replacement of one 2005 diesel school bus with one 2018 EPA-certified diesel school bus. |
Pretty Water Public Schools |
$20,000 |
Replacement of one 2000 diesel school bus with one 2018 EPA-certified diesel school bus. |
Sallisaw Public Schools |
$52,339.90 |
Replacement of one 2000 diesel school bus with one 2018 EPA-certified diesel school bus.
Retrofit two buses with auxiliary heaters. |
Snyder Public Schools |
$19,461.25 |
Replacement of one 2005 diesel school bus with one 2018 EPA-certified diesel school bus. |
Springer Public Schools |
$19,461 |
Replacement of one 2002 diesel school bus with one 2018 EPA-certified diesel school bus. |
Stigler Public Schools |
$18,874.25 |
Replacement of one 2005 diesel school bus with one 2018 EPA-certified diesel school bus. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Jenks Public Schools |
$47,130 |
Replacement of one 1997 diesel school bus with a new 2013 EPA-certified diesel school bus. |
Latta Public Schools |
$38,800 |
Replacement of one 1997 diesel school bus with a new 2012 EPA-certified diesel school bus. |
Pocola Public Schools |
$38,000 |
Replacement of one 1990 diesel school bus with a new 2012 EPA-certified diesel school bus. |
Sallisaw Public Schools |
$105,000 |
Replacement of one 1998, one 2004, and one 2005 diesel school buses with three new 2013 EPA-certified diesel school buses.
Retrofit 10 diesel school buses, model years 2004-2009, with auxiliary heaters. |
Yukon Public Schools |
$66,548 |
Retrofit 38 diesel school buses with auxiliary heaters. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Guthrie Public Schools |
$64,264 |
Retrofit 21 diesel school buses with auxiliary heaters, model years 2002-2005. |
Hominy Public Schools |
$34,000 |
Replacement of one 1994 diesel school bus with a new 2012 EPA-certified diesel school bus. |
Noble Public Schools |
$76,848.41 |
Retrofit 26 diesel school buses with auxiliary heaters, model years 2001-2011. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Beggs Public Schools |
$38,844.89 |
Replacement of one 1994 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Canton Public Schools |
$76,954 |
Replacement of one 1988 and one 1994 diesel school buses with two new 2011 EPA-certified diesel school buses. |
Chisholm Trail Technology Center |
$34,365 |
Replacement of one 1988 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Minco Public Schools |
$30,000 |
Replacement of one 1997, one 1998, one 1999, and one 2003 diesel school buses with four new 2010 EPA-certified diesel school buses. |
Sallisaw Public Schools |
$37,455 |
Replacement of one 1987 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Lawton Public Schools |
$227,496 |
Replacement of 6 model year 1999 or older diesel school buses with new 2010 emissions standard diesel school buses. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Beggs Public Schools |
$40,000 |
Replacement of a 1999 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Chisholm Trail Technology Center |
$37,475 |
Replacement of a 1999 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Friend Public Schools |
$7,918 |
Retrofit three diesel school bus engines with Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems. |
Kingfisher Public Schools |
$59,382 |
Replacement of two 1999 diesel school buses with two new 2010 EPA-certified diesel school buses. |
Lomega Public Schools |
$65,000 |
Replacement of two 1999 diesel school buses with two new 2010 EPA-certified diesel school bus |
Poteau Public Schools |
$61,063 |
Retrofit 14 diesel school bus engines with Closed Crankcase Ventilation Systems and Diesel Multistage Filters. |
Sallisaw Public Schools |
$39,890 |
Replacement of a 1999 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Tulsa Public Schools |
$74,000.05 |
Retrofit 5 diesel school bus engines with Diesel Particulate Filters / Closed Crankcase Ventilation System combinations and 41 diesel school bus engines with Closed Crankcase Ventilation Systems. |
Subgrantee
|
Subaward Amount
|
Project Description
|
Alex Public Schools |
$10,988.00 |
Retrofit two 2005 and three 2006 diesel school bus engines with Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems. |
Allen-Bowden Public Schools |
$134,969.00 |
Replacement of one 1992, one 1994, and one 1995 diesel school buses with three new 2010 EPA-certified diesel school buses. |
Caney Valley Public Schools |
$75,000.00 |
Replacement of one 1997 and one 1998 diesel school bus with two new 2010 EPA-certified diesel school buses. |
Dale Public Schools |
$42,500.00 |
Replacement of a 1995 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Edmond Public Schools |
$333,531.25 |
Replacement of two 1993, two 1995, three 1996, and eleven 1997 diesel school buses with thirteen new 2010 and five new 2012 EPA-certified diesel school buses. |
El Reno Public Schools |
$22,557.50 |
Replacement of one 1988 diesel school bus with a new 2012 EPA-certified diesel school bus. |
Guthrie Public Schools |
$49,629.36 |
Retrofit one 1993, one 1999, twenty-eight 2002, and one 2006 diesel school buses with thirty-one Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems. |
Jenks Public Schools |
$199,399.00 |
Replacement of two 1994, five 1995, and one 1997 diesel school buses with six new 2011 and two new 2012 EPA-certified diesel school buses |
Jennings Public Schools |
$85,000.00 |
Replacement of two 1990 diesel school buses with two new 2011 EPA-certified diesel school buses. |
Lexington Public Schools |
$89,965.00 |
Replacement of two 1997 diesel school buses with two new 2011 EPA-certified diesel school buses. |
Liberty Public Schools |
$154,936.00 |
Replacement one 1987, one 1988, one 1985, and one 1992 diesel school buses with four new 2010 EPA-certified diesel school bus. |
Meeker Public Schools |
$42,242.00 |
Replacement of one 1997 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Meridian Technology Center |
$37,133.75 |
Replacement one 1992 and one 1997 diesel school buses with one new 2011 and one new 2012 EPA-certified diesel school buses. |
Metro Technology Centers |
$117,631.46 |
Replacement of one 1994, 1997, and 1996 diesel school buses with two new 2011 and one new 2011 EPA-certified diesel school buses.
Retrofit 18 diesel school buses with Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems |
Milfay Public Schools |
$36,475.00 |
Replacement of one 1992 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Mount Saint Mary Schools |
$36,500.00 |
Replacement of one 1997 diesel school bus with a new 2010 EPA-certified diesel school bus. |
Noble Public Schools |
$159,056.00 |
Replacement of two 1987, one 1988, and one 1991 diesel school buses with four new 2010 EPA-certified diesel school buses. |
North Rock Creek Public Schools |
$40,000.00 |
Replacement of one 1995 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Okmulgee Public Schools |
$156,969.00 |
Replacement of one 1992 and three 1994 diesel school buses with four new 2011 EPA-certified diesel school buses. |
Poteau Public Schools |
$43,396.00 |
Replacement of one 1996 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Prague Public Schools |
$41,544.00 |
Replacement of one 1996 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Pretty Water Public Schools |
$48,875.00 |
Replacement of one 1998 diesel school bus with a new 2011 EPA-certified diesel school bus.
Retrofit one 1997 diesel school bus with a Diesel Oxidation Catalyst and Closed Crankcase Ventilation System. |
Putnam City Public Schools |
$500,000.00 |
Replaced thirteen 1987, six 1991, and two 1996 diesel school buses with thirteen new 2011 and eight new 2012 EPA-certified diesel school buses.
Retrofit forty-eight diesel school buses with auxiliary heaters. |
Sand Springs Public Schools |
$36,919.00 |
Replacement of one 1987 diesel school bus with a new 2011 EPA-certified diesel school bus. |
Shawnee Public Schools |
$159,934.00 |
Replacement of one 1989, 1991, 1993, and 1994 diesel school buses with four new 2011 EPA-certified diesel school buses. |
Tuttle Public Schools |
$77,081.00 |
Replacement of one 1984 and one 1988 diesel school buses with two new 2011 EPA-certified diesel school buses. |
Yukon Public Schools |
$110,157.71 |
Retrofit 39 diesel school bus engines with Diesel Oxidation Catalysts and Closed Crankcase Ventilation Systems. |